Data and Document Collection for FM Handover

We have recently published a series of blogs all focused around the need to provide, at handover, a rich, robust, reliable data set to support Owners through the entire life cycle of the facility. These three blogs, Level of Information Need, Data Quality, and Digital Twins highlight the steps needed to establish goals and uses and to generate the required collated information.
This short video demonstrates some of the features in our BIMFMi platform that enables us to link design intent data with all defined installed asset information.
In future posts, we will showcase more of the functionality and final deliverables that can be generated from a robust dataset. Stay tuned!
If you are interested in learning more please contact us.
Related Posts

The End is where to Begin

BIM, AI, and Digital Twins: Key Lessons from Toronto’s BIM Summit 2025

Building Knowledge: Introduction to Building Information Modeling (BIM)

The Data is the Deliverable

Resolving to Embrace Change

Debunking Common Misconceptions in Architecture during Design and Construction: Sustainability and BIM Integration

Data Collection through Construction
